From approved scope to coordinated site work
How an additional FAR construction project is planned.
FAR extension execution starts from the sanctioned scope, structural drawings and site constraints. Trishul Realcon coordinates its work with the appointed architect, structural consultant and society representatives so that construction follows the approved information available for the project.
For an occupied CGHS property in Dwarka, the execution plan also needs controlled access, material movement, working-area protection and practical sequencing around residents. RCC work, masonry, services and finishing activities are scheduled as related stages rather than treated as isolated packages.
The exact responsibility is confirmed project by project. The published scope on this page is specific: plumbing work means conduiting work only, while the listed electrical scope includes conduiting, wiring, switches and sockets. Any item outside the agreed scope is not implied.